{"id":4181,"date":"2025-11-15T10:19:40","date_gmt":"2025-11-15T10:19:40","guid":{"rendered":"https:\/\/www.stabilroad.ee\/?p=4181"},"modified":"2025-11-16T09:48:16","modified_gmt":"2025-11-16T09:48:16","slug":"kolga-jaani-test-section-stabilization-project-10-years-later","status":"publish","type":"post","link":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/","title":{"rendered":"Kolga-Jaani test section stabilization project 10 years later"},"content":{"rendered":"<p>In July 2015, a significant infrastructure project was carried out in Kolga-Jaani, involving the stabilization of a gravel-surfaced test road section. The goal of the project was to improve the quality and durability of the road segment by ensuring a dust-free, stable, and sufficiently strong surface capable of withstanding local traffic loads. In the second year, the road section was treated with a bitumen emulsion and crushed stone surface (a so-called chip seal), and in the fourth year, a 4 cm thick asphalt layer was added.<\/p>\n<p>StabilRoad Holding has continuously monitored the condition of the road segment over the past 10 years. As part of this monitoring, core samples have been taken from the road surface every two years to assess changes in the compressive strength of the stabilized soil through laboratory testing. The results show an average increase in compressive strength of 1.0 to 3.0 MPa over the ten-year period\u2014an exceptionally positive outcome. Visual inspections confirm that the appearance of the stabilized road surface has remained unchanged compared to its original condition. Based on current assessments, the same level of stability and strength is expected to persist for the next 50 to 100 years.<\/p>\n<p><a href=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-960x540.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-landscape_m wp-image-4256\" src=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-960x540.jpg\" alt=\"\" width=\"960\" height=\"540\" srcset=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-960x540.jpg 960w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-320x180.jpg 320w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-768x432.jpg 768w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-640x360.jpg 640w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B-705x397.jpg 705w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-B.jpg 1280w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-960x540.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-landscape_m wp-image-4259\" src=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-960x540.jpg\" alt=\"\" width=\"960\" height=\"540\" srcset=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-960x540.jpg 960w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-320x180.jpg 320w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-768x432.jpg 768w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-640x360.jpg 640w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C-705x397.jpg 705w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-C.jpg 1280w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-960x540.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-landscape_m wp-image-4262\" src=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-960x540.jpg\" alt=\"\" width=\"960\" height=\"540\" srcset=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-960x540.jpg 960w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-320x180.jpg 320w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-768x432.jpg 768w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-640x360.jpg 640w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D-705x397.jpg 705w, https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-D.jpg 1280w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/a><\/p>\n<ul>\n<li><a href=\"https:\/\/www.stabilroad.ee\/en\/project\/stabilization-of-the-kolga-jaani-gravel-test-road-section\/\">About project<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>In July 2015, a significant infrastructure project was carried out in Kolga-Jaani, involving the stabilization of a gravel-surfaced test road section. The goal of the project was to improve the quality and durability of the road segment by ensuring a dust-free, stable, and sufficiently strong surface capable of withstanding local traffic loads. In the second [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4254,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[73],"tags":[111,93,123,115,155,165],"class_list":["post-4181","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles","tag-environmental-friendly","tag-estonia","tag-gravel-road","tag-kolga-jaani-en","tag-stabilization","tag-transport-authority"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>StabilRoad | Kolga-Jaani test section stabilization project 10 years later<\/title>\n<meta name=\"description\" content=\"J\u00e4tkusuutlik pinnaste stabiliseerimise tehnoloogia\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"StabilRoad | Kolga-Jaani test section stabilization project 10 years later\" \/>\n<meta property=\"og:description\" content=\"J\u00e4tkusuutlik pinnaste stabiliseerimise tehnoloogia\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/\" \/>\n<meta property=\"og:site_name\" content=\"StabilRoad\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-15T10:19:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-16T09:48:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-A.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"superadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"superadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/\"},\"author\":{\"name\":\"superadmin\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#\\\/schema\\\/person\\\/285e1d69027bacc4b345ca0f27bdd69d\"},\"headline\":\"Kolga-Jaani test section stabilization project 10 years later\",\"datePublished\":\"2025-11-15T10:19:40+00:00\",\"dateModified\":\"2025-11-16T09:48:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/\"},\"wordCount\":198,\"publisher\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.stabilroad.ee\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/SRN-2025-02-A.jpg\",\"keywords\":[\"environmental friendly\",\"estonia\",\"gravel road\",\"kolga-jaani\",\"stabilization\",\"transport-authority\"],\"articleSection\":[\"Articles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/\",\"url\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/\",\"name\":\"StabilRoad | Kolga-Jaani test section stabilization project 10 years later\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.stabilroad.ee\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/SRN-2025-02-A.jpg\",\"datePublished\":\"2025-11-15T10:19:40+00:00\",\"dateModified\":\"2025-11-16T09:48:16+00:00\",\"description\":\"J\u00e4tkusuutlik pinnaste stabiliseerimise tehnoloogia\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.stabilroad.ee\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/SRN-2025-02-A.jpg\",\"contentUrl\":\"https:\\\/\\\/www.stabilroad.ee\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/SRN-2025-02-A.jpg\",\"width\":1280,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/kolga-jaani-test-section-stabilization-project-10-years-later\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kolga-Jaani test section stabilization project 10 years later\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/\",\"name\":\"StabilRoad\",\"description\":\"Sustainable soil stabilization technology\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#organization\",\"name\":\"StabilRoad\",\"url\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.stabilroad.ee\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/logo-general.svg\",\"contentUrl\":\"https:\\\/\\\/www.stabilroad.ee\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/logo-general.svg\",\"width\":190,\"height\":90,\"caption\":\"StabilRoad\"},\"image\":{\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/#\\\/schema\\\/person\\\/285e1d69027bacc4b345ca0f27bdd69d\",\"name\":\"superadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89ba0ed9f6e95b8a4862c6974e81e5963fd87aee64a9e43b911275dcefee7ef3?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89ba0ed9f6e95b8a4862c6974e81e5963fd87aee64a9e43b911275dcefee7ef3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89ba0ed9f6e95b8a4862c6974e81e5963fd87aee64a9e43b911275dcefee7ef3?s=96&d=mm&r=g\",\"caption\":\"superadmin\"},\"sameAs\":[\"https:\\\/\\\/www.stabilroad.ee\"],\"url\":\"https:\\\/\\\/www.stabilroad.ee\\\/en\\\/author\\\/superadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"StabilRoad | Kolga-Jaani test section stabilization project 10 years later","description":"J\u00e4tkusuutlik pinnaste stabiliseerimise tehnoloogia","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/","og_locale":"en_US","og_type":"article","og_title":"StabilRoad | Kolga-Jaani test section stabilization project 10 years later","og_description":"J\u00e4tkusuutlik pinnaste stabiliseerimise tehnoloogia","og_url":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/","og_site_name":"StabilRoad","article_published_time":"2025-11-15T10:19:40+00:00","article_modified_time":"2025-11-16T09:48:16+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-A.jpg","type":"image\/jpeg"}],"author":"superadmin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"superadmin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#article","isPartOf":{"@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/"},"author":{"name":"superadmin","@id":"https:\/\/www.stabilroad.ee\/en\/#\/schema\/person\/285e1d69027bacc4b345ca0f27bdd69d"},"headline":"Kolga-Jaani test section stabilization project 10 years later","datePublished":"2025-11-15T10:19:40+00:00","dateModified":"2025-11-16T09:48:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/"},"wordCount":198,"publisher":{"@id":"https:\/\/www.stabilroad.ee\/en\/#organization"},"image":{"@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#primaryimage"},"thumbnailUrl":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-A.jpg","keywords":["environmental friendly","estonia","gravel road","kolga-jaani","stabilization","transport-authority"],"articleSection":["Articles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/","url":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/","name":"StabilRoad | Kolga-Jaani test section stabilization project 10 years later","isPartOf":{"@id":"https:\/\/www.stabilroad.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#primaryimage"},"image":{"@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#primaryimage"},"thumbnailUrl":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-A.jpg","datePublished":"2025-11-15T10:19:40+00:00","dateModified":"2025-11-16T09:48:16+00:00","description":"J\u00e4tkusuutlik pinnaste stabiliseerimise tehnoloogia","breadcrumb":{"@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#primaryimage","url":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-A.jpg","contentUrl":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2025\/11\/SRN-2025-02-A.jpg","width":1280,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/www.stabilroad.ee\/en\/kolga-jaani-test-section-stabilization-project-10-years-later\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.stabilroad.ee\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Kolga-Jaani test section stabilization project 10 years later"}]},{"@type":"WebSite","@id":"https:\/\/www.stabilroad.ee\/en\/#website","url":"https:\/\/www.stabilroad.ee\/en\/","name":"StabilRoad","description":"Sustainable soil stabilization technology","publisher":{"@id":"https:\/\/www.stabilroad.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.stabilroad.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.stabilroad.ee\/en\/#organization","name":"StabilRoad","url":"https:\/\/www.stabilroad.ee\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.stabilroad.ee\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2024\/05\/logo-general.svg","contentUrl":"https:\/\/www.stabilroad.ee\/wp-content\/uploads\/2024\/05\/logo-general.svg","width":190,"height":90,"caption":"StabilRoad"},"image":{"@id":"https:\/\/www.stabilroad.ee\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.stabilroad.ee\/en\/#\/schema\/person\/285e1d69027bacc4b345ca0f27bdd69d","name":"superadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/89ba0ed9f6e95b8a4862c6974e81e5963fd87aee64a9e43b911275dcefee7ef3?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/89ba0ed9f6e95b8a4862c6974e81e5963fd87aee64a9e43b911275dcefee7ef3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/89ba0ed9f6e95b8a4862c6974e81e5963fd87aee64a9e43b911275dcefee7ef3?s=96&d=mm&r=g","caption":"superadmin"},"sameAs":["https:\/\/www.stabilroad.ee"],"url":"https:\/\/www.stabilroad.ee\/en\/author\/superadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/posts\/4181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/comments?post=4181"}],"version-history":[{"count":3,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/posts\/4181\/revisions"}],"predecessor-version":[{"id":4266,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/posts\/4181\/revisions\/4266"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/media\/4254"}],"wp:attachment":[{"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/media?parent=4181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/categories?post=4181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.stabilroad.ee\/en\/wp-json\/wp\/v2\/tags?post=4181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}